Toll Road - PT Marga Harjaya Infrastruktur
Toll Road Technical Data

PT Marga Harjaya Infrastruktur (Astra Infra Toll Road Jombang-Mojokerto), a concession holder of the 40.5 km Kertosono - Mojokerto toll road, joined Astra Infra group in August 2011. As part of the Java trans-toll road, this toll road plays an important role as a link between East Java and Central Java. This toll road became operational in stages.

The 14.7 km long section 1 became operational in October 2014, followed by the 5 km section 3 operating in November 2016, and a 19.9 km long Section 2 in September 2017. The 0.9 km long Section 4 will be opened in conjunction the adjacent with the Solo-Kertosono.

In total, the Jombang-Mojokerto toll road has 3 toll gates, namely Jombang toll gate (in Pesantren Village, Tembelang Sub-district, Jombang, East Java), Bandar toll gate (in Kayen Village, Bandarkedungmulyo Sub-district, Jombang), and West Mojokerto toll gate (in Pagerluyung Village, Gedeg Sub-district, Mojokerto, East Java).

Jombang Toll Gate
Gerbang Tol Bandar
Mojokerto Toll Gate
Mojokerto Barat Toll Gate
Rest Area Kedagangan
Mojokerto Barat Interchange
Jombang-Mojokerto Section 3
Simpang Susun Jombang
Brantas Bridge